Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Babcock Ranch CCSO District 5 Office
Last Updated: 04/10/2024 Category: County Facilities Current Phase: Construction
The 12,000 square foot building shell has been completed by Kitson Partners of Babcock Ranch in partnership with Florida Premier Contractors. The interior work is expected to start April 2024.Last Updated: 04/10/2024 Category: County Facilities Current Phase: Construction
This 12,000 square foot three-bay facility will be a state-of-the art with hurricane impact rated bi-fold doors for additional protection. Interior build-out will begin April 2024.Last Updated: 04/09/2024 Category: Roadway Current Phase: Planning and Project Approval
Flamingo/Edgewater Widening
South Gulf Cove Bridge Repairs - Construction
Last Updated: 04/09/2024 Category: Bridges Current Phase: Construction
South Gulf Cove Bridge Repairs - (Bridges #014053, #014054, #014055, #014056)Landfill Scale House (Zemel Road)
Last Updated: 04/08/2024 Category: County Facilities Current Phase: Construction
The scale house at the Zemel Road Landfill is currently a trailer nearing end of expected usable lifecycle. Additionally, not compliant with the County's Ordinance of not utilizing trailers as permanent operations. The project would move the physical location of the scale house and its ancillary functions of a convenience center and household hazardous waste. The project will also streamline the flow and control of traffic in and out of the landfill.
Port Charlotte Beach Recreation Center
Last Updated: 04/08/2024 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development
Design a new recreation center that will serve the current needs of rental venue for events, as well as community facilities for sailing and regatta events.Sheriff District 4 HQ, Training Facility and K9 Unit
Last Updated: 04/08/2024 Category: County Facilities Category: Sales Tax Funded Current Phase: Construction
Construction of a replacement District 4 Headquarters Facility with a training component and K9 kennel/training area replacing existing facilites. The district office will utilize the prototype layout from District 1. The training building area will be incorporated into a single facility. The facility will be constructed at the Airport Road Annex site, replacing the existing Sheriff's Training, Supervisor of Election and old Transit Facility .Riverside Boat Ramp Replacement
Last Updated: 04/08/2024 Category: Parks And Recreation Current Phase: Design Development
As part of the CMP, Community Services is conducting structural assessments on all piers, boardwalks, seawalls and boat ramps; through this assessment process it was bought to CS attention that Riverside Boat Ramp provides immediate safety concerns. During the site analysis the engineer determined the ramp could not be repaired in place; this project will be to design a replacement ramp that alleviates the safety issues.
Last Updated: 04/08/2024 Current Phase: Planning and Project Approval